Project image: Palácio Tangará
CASE 001

Hospitality · São Paulo

Palácio Tangará

Coordinating foodservice and laundry within a highly complex hotel operation.

01

Coordinating foodservice and laundry within a highly complex hotel operation.

Restaurants, banqueting, room service, events and laundry form a single operational system. The design coordinated flows, equipment and interfaces to support each service with precision.

FoodserviceLaundryHospitalityTechnical integration

Design decisions

01

Working with minimal clearance

The monolithic resin floor was coordinated over the existing slab with only 50 mm of clearance.

02

Resolving the laundry ceiling height

A 100 mm recess and a bespoke conveyor resolved the 2.5 m ceiling constraint.

03

Ventilating on demand

Waterwash hoods with UV and demand control were selected around noise, energy and the hotel context.

Timeline

  1. 2014Technical review, schematic design and initial deliverables
  2. 2015Detailed design for kitchens and laundry
  3. 2016 to 2017Technical procurement, fabrication, installation and oversight
  4. 2017Hotel opening
  5. 2019International FCSI publication
Project image: Palácio Tangará
04
Different service moments supported by precise, safe and discreet infrastructure.

Credits

Palácio Tangará

Development
GTIS Partners
Operation
Oetker Collection
Architecture
B+H Architects / PAR Arquitetura
Project management
Hochtief do Brasil
Photography
James Merrell